Wns Series Gas Fired 5 Ton Steam Boiler


Wns Series Gas Fired 5 Ton Steam Boiler

First, when the flue temperature dropped to below 50 ℃ Solution: Check the tail may enter the flue if heated, while the flue thoroughly remove soot. No burning flue tail, can be re-started ignition; if burning, should be replaced, repaired burning member. Second, the combustion chamber when the negative pressure is too large Solution: When the exhaust gas temperature close to the temperature of the injected steam, or less than 150 deg.] C over 1 hour and stable, open the inspection hole inspection; after inspection after confirming the fire source, before start the fan ventilation. Third, shutdown or fire, air gun valve ajar solutions: reinforcing and electric wns series fired 5 ton steam boiler feed water drainage, or open the valve economizer recirculation tube to protect the economizer is not burning. Fourth, Kai, during shutdown lower furnace temperature, a solution of unburned fuel in the furnace: extinguishing device immediately put into vapor, carbon dioxide or other devices off fire. Five burning improperly adjusted, with insufficient wind or with the wind unreasonable Solution: Close the flue duct and baffle around the door opening, start sending prohibited, induced draft fan. These are the methods of electric heating steam boiler fast boiler to provide you with the handling of soot in the chimney, if you use electric steam boilers, with more than five can control their own boiler equipment need to be cleared up the flue, and select the appropriate method .

Fast boiler in gas boiler industry has been at the leading level for low nitrogen environmental aspects of deep research. Dingzhou Yili Dairy determined after reaching cooperation with our company, launched a work plan for the boiler low-nitrogen transformation. Yili Dairy Dingzhou three original boiler 15t / h gas wns series fired 5 ton steam boiler, NOx emissions have reached 150mg / Nm3, belonging to the boiler equipment far exceeded. After the party fast professional and technical engineers, boiler and boiler model parameters to fully understand the components, rapidly developed a specific rehabilitation programs, start from the combustion system to achieve NOx emissions of 30mg / Nm3 to meet the most stringent environmental standards of the atmosphere.

Industrial gas wns series fired 5 ton steam boiler room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger.

Principles of wns series fired 5 ton steam boilers and solutions hydraulic external gear of Henan fast boiler's small series with you about the principles of steam boilers and solutions Steam Boiler hydraulic external gear in accordance with the fuel (electricity, oil, gas) can be divided into electric steam boilers, oil three kinds of steam boilers, gas and steam boiler; constructed according to the steam boiler can be divided into vertical, horizontal steam boiler, steam boiler compact than a single, double return of the vertical structure, large steam boiler return of more than three horizontal structure . If the classification according to top standards, in the form of steam boilers on the lot, would like to give an ordinary packaged boiler say four tons vapor. Water in the steam drum is heated to become vapor, fire emits heat in the furnace, it is the principle of the steam boiler. Steam boiler combustion section and drive means by a chain grate, a combustion chamber together with the pan rack frame formed on a grate composition. Four weeks envelope refractories. From coal fired into the hopper, the shutter coal front portion while sealing air control seam thickness. Blowing into the combustion chamber is a lower place, such steam boilers greater resistance, require forced air. Steam boiler cinder burn out, the rear portion of the grate by the "beak iron" discharged from the slag out of the furnace feeding machine. Steam boiler flue gas from the back of the boiler, the steam drum of a boiler return line before the smoke tube, returned by two return rear smoke tube, and then into the dust separating ashes, and then discharged through the chimney draft fan. These are the works of steam boilers, steam boilers run course, ultimately, other devices, such as induced draft fan not only bear the task of exhaust fumes, or negative pressure necessary for operation of the steam boiler. As well as pressure vessels, thermometer, safety valves, pressure gauges, pumps, steam pumps, and so on. They are essential for steam boiler work. Pump leaks. Gear pumps for leaks during operation, leading to its actual output is smaller than the theoretical flow of traffic. The main channel is leaking gear pump: through the gap between both surfaces and both side surfaces of the gear cover side leakage, accounting for 75% to 85% of the total leakage of the pump; radial gear tip circle between the inner hole and the pump CLEARANCE ; gap by engagement of the gear leak. The gear pump due to the presence of a leak, so that the output pressure do not increase, the influence of the use of a gear pump. In order to solve the low gear pump output pressure problems, may be employed on both sides of the elastic gear plus floating collar or baffle manner, to reduce the leakage of the gear pump, the gear pump to increase the output pressure. Radial force imbalance. In the gear pump during operation, the pressure acting on the outer gears are not equal, resulting in the gear and bearing at the axle radial imbalance force. This unbalanced force will accelerate the radial bearing wear and reduce the service life of the bearings, the gear shaft deformation can also cause friction with the inner hole of the addendum pump, pump damage, so that the pump does not work. The solution generally adopted is: ④ opening pressure balancing grooves to the pump, the high pressure oil introduced into the low pressure zone, but will increase the pump leak, the influence of the volumetric efficiency of the pump; ② size reduction oil pressure chamber, acting on the teeth the pressure area is reduced, thereby reducing the radial force imbalance.

Other Products