The Best Central Heating Boilers


The Best Central Heating Boilers

Main steam the best central heating boilers gas valve and other valves, and a predetermined baffle flue gas system 1 shall be clearly marked boiler tubes, valves and dampers marked name, number, and media flow direction switching direction, should the main regulator valve for opening degree indication. Valve, the shutter operating mechanism should be installed at a location convenient to operate. 2 main steam valve should be installed near the outlet of the drum (potshell) or the header of the superheater. Boiler unit consisting of machine, the main steam valve the inlet of the turbine can be installed. Main steam valve vertical shell boiler may be installed in the boiler room to facilitate local operations. On each boiler steam pipe with steam header pipe is connected, cutting two valves shall be installed, it should be equipped with a drain pipe and cutting the valve between the valve open to the atmosphere, an inside diameter not less than 18mm. 3 evaporation rated greater than or equal to 220t / h boiler to be provided to the remote air exhaust valve. Fractional economizer inlet 4 can not be fitted to the water supply pipe and the water supply valve shut-off valves. For unitary unit, not fitted with a check valve to a water tube boiler feed water. The inlet of the economizer and separable leading drum (potshell) are mounted to the water supply pipe should be cut off the water supply valve and check valve. 5 feed water shut-off valve should be mounted between the drum (boiler shell) (or economizer inlet header) and a water supply valve and the check valve immediately connected with the water supply. 6 in the rated evaporation 4t h boiler / automatic water regulator shall be installed, operated and easy to place in the installation manual means fireman who feedwater control. 7 rated steam pressure is greater than or equal to 3.8MPa boiler pipes should be urgently put in a minimum security indirect drum water level and normal water level, discharge pipes should be installed on the valve, once full of water occurs in order to promptly turn on the water. This valve must be turned off in the boiler running. 8 in the drum (potshell), superheater, reheater and economizer, etc. which could gather air should be fitted with an exhaust valve. Different operating pressure of the boiler 9 should have a separate steam pipes and water pipes, respectively. When employed as a main steam pipe, the steam pipe must have a higher pressure automatic decompression device, and a safety device that prevents the low-pressure side of the overpressure (check valve). When the water pressure which does not exceed the maximum working pressure of 20% of the total water supply can feed water to the boiler system. 10 boiler feedwater system should ensure safe and reliable water supply. Boiler room should have an alternate water supply equipment. And the number of spare capacity and a water supply device is arranged water supply system, is determined by the design of the boiler room units according to the design specifications. 11 rated greater than or equal to evaporation 1t / h boiler water sampling device should pot, when steam quality requirements, there should be vapor sampling means. Sampling means and the sampling point location should be taken to ensure that water vapor representative sample.

Need to select the appropriate power, the power when electric the best central heating boilerss for heating according to heating demand is too large will waste money, power smaller reach to user requirements. In general, electric boilers for heating outlet temperature is above 70 ℃, 30 minutes each household radiator temperature can reach 75 ℃; one cubic meter of heating area needs about 35W of heat, you can combine their own after heating the area to be calculated using the specific electric power boiler.

By the best central heating boilers fuel energy can be transmitted to the device, it is very popular in large chemical plants, food processing plants, heating companies and other industries. However, for the boiler operation aspect, some people there are still some misunderstanding, fast Boiler today to talk about the 7 most common errors boiler operation, I hope we can avoid them, avoid boiler causing serious accidents.

Central heating hot water the best central heating boilerss for heating in winter is an important measure in most parts of China. Hebei Guan China Fortune Foundation Limited mainly engaged in real estate projects, is a leading industrial town operators. Heating service is primarily aimed at the Group's residential housing and other real estate. With the full open sky Battle, continue to improve the proportion of clean heating, heating for the implementation of clean energy, China Fortune Foundation to purchase much-needed high performance hot water boiler clean and green products. After comparing a number of boiler plants, the best of the best, determined to cooperate with the fast boiler in abundant clean energy R & D experience in boiler party. Providing fast boiler SZS Series 2 gas hot water boiler according to the actual needs, respectively 58MW and 29MW.

Other Products