Steam Boilers High Efficiency


Steam Boilers High Efficiency

The first way to extend the service life of a Fangkuai hot water boiler is to use the Fangkuai boiler, because it is a hot water boiler, then, in the boiler, there must be a large amount of water, and when there is no water, it will be necessary to replenish the water in time at this time. Note, however, that there is no need for a one-off replenishment of a large amount of water, just a little less at each replenishment. In order to prevent the corrosion of the furnace body of the hot water boiler, it is better to add some oxygen-free water directly into the furnace during the process of water replenishment in order to prevent the corrosion of the furnace body of the hot-water boiler in order to prevent the corrosion of the furnace body. Second, if you want to In order to better protect hot water Fangkuai boilers, sodium sulfite and professional trisodium phosphate need to be added directly to the boiler. Not only in the use of the process needs to be maintained, in the absence of the same need for maintenance, if the shutdown time is longer, then, more attention to the maintenance of the problem. At the same time, in the maintenance time, different decommissioning time, need the maintenance method is also different.

After the fuel gas-fired boiler heating picture above situation looked fuel gas-fired central heating boiler in terms of the effect of coal-fired boilers can we achieve it? The survey research is now within our country most of the city are in the district heating, a small supply of fuel gas-fired boiler can be a cell, and if we put a number of district heating so together it will cause a chain reaction?

During installation, the technical team fast boiler plant according to the specific needs of our environment, our rational arrangement of stacks, pipes, and other auxiliary equipment, let us bring a lot of convenience in the latter part of the course. Fang fast responsible attitude also gives us impressed, sent a technical team for installation, commissioning and training to us, let us rest assured, peace of mind, peace of mind. --customer feedback

Industry gas boiler room Standard Operating Procedures industrial gas boiler room Standard Operating Procedures industrial gas boiler blast furnace ready to start: gas system: check the gas pressure and the internal combustion engine are matched pressure is normal, not too high or too low, continue under normal circumstances confirm Next. Water supply system: Check the water softening equipment running, the indicators softened water should comply with the relevant national standards. Check level gauge, level indicator switch must be opened, to prevent false water level, to avoid heating the intake air. Check pump for watering, otherwise opening the exhaust valve until the water so far. Stop watering until the water level of 2/3. Close filling pumps and valves. Line pressure: Open inlet and return valve, open No. 1 or No. 2 circulation pump, watching the pressure gauge pressure is normal, the pressure range, and the exhaust air inspection system situation. Electrical system: Check that all control buttons cabinet in an open position, if not open, turn on the switch, turn on the switch to open the order is part of the master switch. Industrial gas boiler flow: System water: Open replenishment pump switch or hand switch is turned on. Another choice is to switch the pump I or II selected pump. (1) Before performing rehydration is necessary to observe whether there is water inside the water softener. (2) while discharging water and discharged from the bottom up high-rise buildings, water supply until the water flow stable and stops. Start boiler front pump (circulation pump), to open the boiler control cabinet, open the internal switch, the cabinet door closed, the circulation pump start switch is pressed, a green light, running forehearth pump (circulation pump), so that a uniform water circulation system. Start boiler: Press the boiler switch red switch button intelligent digital boiler controller, then press the green Start / Stop button, the green light and burner wind, wait a few seconds, the engine ignition, start a normal combustion. Check the record: all the equipment and check the pipes regularly check the boiler. Industrial gas boiler start-ignition combustion: ensure the main power switch, a button to open the burner, fan sweep should begin immediately. Burner ignition failure, fault lights for 20 seconds, press the reset button to restart consecutive three or four ignition failure, successful ignition, should be reported to repair. When the burner is closed due to some failure, each system should be checked to confirm or displacement. After the fault is acknowledged and eliminated, the burner will restart.

Other Products