Paddy Parboil Drier Boiler Plant


Paddy Parboil Drier Boiler Plant

6 tons of gas steam paddy parbdrier boiler plant start / ignition / boost a description, unit 1 starts, the boiler starts to open the first draft fan. 2, the induced draft fan starts normally from about 1 to 3 minutes blower opening. 3, starting Cleaner. 4, rotation of the grate, and adjusted appropriately stalls second ignition 1, ignition starts after all the examination was normal, the amount of wind and the wind blowing good after normal combustion seam to be adjusted to maintain a certain furnace pressure (-15 ~ -30Pa ). 2, when the temperature is increased Stokes is not too fast, the time from ignition to supply the steam required for less than 2 hours. 3, when the air vent has steam coming off when air vent. Third, the booster 1, when the boiler is boosted to 0.1 ~ 0.2MPa, to the flushing water pressure gauges trap. 2, when the boiler is boosted to 0.2 ~ 0.3MPa, to check every one hole, hand holes, valves and other leaks, if the screws are loose (if the screws are loose, the screw must be tightened). 3 when the boiler is pressurized to 0.3 to 0.4MPa, sewage drain valve open time of the drum, reducing the temperature difference between the upper and lower drum to promote water circulation. 4, when the drum steam pressure gradually increased, the components of the boiler to be noted that there are no special or abnormal sound occurs, if the above anomalies, should immediately check, shutdown can check, if necessary, until the fault is cleared before continuing 6 run. 5, during boiler Stokes, economizer outlet water temperature must be monitored to prevent moisture inside of the economizer, economizer valve leading to the drum can be closed if necessary, open the economizer recirculation valve leading to the tank, of water economizer alone, but before the steam supply to return to normal position, to prevent water shortages.

Food is food industry is human life industry, but also an ancient and eternal evergreen industry. Industrial steam paddy parbdrier boiler plant as an integral part of the chain, is mainly used for processing of distillation, extraction, sterilizing, drying, curing and other processes. Anqing City, Anhui Province is located in the Want Want Foods Co., Ltd. mainly engaged in all kinds of puffed food processing and manufacturing and sale of steam boiler steam delivered directly or indirectly in contact with food, thus requiring the steam quality is very high. Due to expanding production needs, Want Want Foods in urgent need of a boiler plant to provide high-quality steam. After a comprehensive understanding of the boiler industry, determined to cooperate with the fast boiler. Want fast square perennial cooperation with the country's food company, it has considerable experience of cooperation. By understanding the needs of the Want Want food production, providing a whole 10 tons of steam condensing gas steam boiler (WNS10-1.25-Y.Q).

Boiler has a paddy parbdrier boiler plant fireman requirements of high temperature, high pressure thermal equipment, when in use will be very hot, so when you use it in the user's need to find a dedicated fireman to operate, the following will give you about at the fireman's requirements: 1, fireman is a special technical work, the use of boiler units shall be in strict accordance with the "boiler fireman who secure technology assessment management approach", selected training fireman people, and get supervision department issued operating certificate , before taking action. 2, familiar with the role of a safety device, the operation principle and performance, can draw or oral air, water, the flue gas flow. 3, fireman would be required to recognize the importance of their posts to work, to do due diligence and dedication, job dedication. 4 for the boiler water quality indicators and basic knowledge of water treatment. 5, a week to learn about the National Board of Boiler safety regulations. Rules and regulations, the contents of the relevant aspects of the safe use of the boiler, should be familiar to memorize. 6, holding body, auxiliary boiler room and sanitation. 7, to carry out general repairs and maintenance of safety equipment subsidiary boilers and other equipment operation, can eliminate common problems and accident emergency treatment. 8, carefully stick to their posts, not unauthorized absence from the boiler room, subject to post-job discipline. 9, skilled, able to correctly adjust operating parameters to meet the production needs of life outside weather changes and the adoption of better selection of operating conditions based on the run, less energy consumption. Fireman boiler must go through the job evaluation, operation time must wear protective tools, non-inexperienced personnel to operate, most people are not allowed to enter the room, to avoid high temperatures lead to casualties.

On the provision of hot water steam paddy parbdrier boiler plants, steam boilers now choose not simply be used in life, industry, steam boilers also have very good results, and this is choose the right specific requirements of steam boilers, strictly speaking, industrial production a suitable use of the market, you need to pay attention to the safety of the boiler, in the aspects of power plant or shipbuilding, competitive enterprises is quite clear where.

Other Products