Natural Gas Fired Steam Boiler


Natural Gas Fired Steam Boiler

Gas boiler installation and preparation requirements of (a) the preparatory work before the installation of a boiler installation must be installed by the unit has installed a license .. The installer must be familiar with "Boiler Safety Technology Supervision", and carefully read the installation instructions and other random technical documents. 2, a mounting position: 1) as close as possible to install a boiler steam, hot site, to facilitate shortening the hot water and steam pipes, reducing capital costs, reducing the pipeline heat loss. The installation site should be water supply, sewage convenience. Burning light diesel oil, heavy oil residue and the boiler must be closer to the oil reservoir; burning natural gas, town gas boiler must be easy to close the gas source. 2) boiler room layout should follow the "Boiler Safety Technology Supervision" relevant provisions "boiler room", to be well-lit, well-ventilated, no ground water, ease of operation and maintenance, boiler room must be equipped with at least two fire extinguishers 1211. 3) Check the boiler foundation, prepare the boiler in place. 3, equipment acceptance: acceptance by conduct an inventory purchase contract or supply list. 4, lifting large boiler: not less than 1.1 times the lifting equipment of large weight of the boiler, two lugs for the lifting jack top or at the bottom edge away slowly, not to any other parts of the lifting or addendum to avoid damage to the boiler. (Ii) installation requirements: 1, the main steam line installation requires the main steam lead pipe height is generally greater than 0.5 m, the bending radius should be greater than or equal to 5 times the diameter of the pipe, the pipe should be installed at the lowest trap, preventing water pipe, It should be a main steam pipe insulation. 2, a main return pipe installation requirements should the main return pipe elbow minimize installation, to facilitate the mounting operation of the valve, piping should be insulated. 3, the hydrostatic testing relief valve, the safety valve should be installed in the exhaust pipe, the exhaust pipe connected to the straight pipe outdoor safety. 4, should be connected to a sewage outfall tank or other security, the pipe should be secured to prevent shifting or counter scald accidents blowdown. 5, railings, stairs (with large oven) after the positioning by drawing the boiler installation. 6, water table must be installed to the lighting device, easy to install or inspection.

The use of electric fired steam boilers What are the requirements? General Electric steam boiler is to be converted into an energy form of heat, through the conversion of the boiler can be turned into heat energy of steam or hot water, which requires the use of gas when you have it steam boiler, steam boiler in the first before water is necessary to check each valve, steam pipe, pressure variations, water tables, etc. also note the drain valve is not also intact. after the steam inside the boiler should be kept clean to be used, to which water is after softening the outer glass tube in the water table to be equipped with rugged protective cover, but also to keep it clean after each use it is necessary to scrub, as well as to see the water level of the water table there rise or fall, if it stops phenomenon, we must immediately investigate the cause. after the adjustment is not just above the steam boiler safety valve.

10 tons of horizontal gas hot water boiler safety features Henan party nearly 10 tons of gas hot water boiler can be divided according to the type of gas hot water boiler WNS and SZS gas hot water boiler, meaning both what is it? WNS means is a horizontal-type combustion chamber burner, meaning that double drum SZS vertical type burning furnace chamber, although the two different processes of different structures, but the fuel and the safety device are the same. This chapter focuses to introduce safety protection system of the two kinds of boiler: 1, interlock protection system ① As the two kinds of dual-use oil and gas boilers are in this together computing, once the fuel or air pressure below the minimum set when the standard, it will automatically cut off the fuel supply ② cold water delivery device event of a failure, will automatically cut off the fuel supply ③ water temperature is higher than the highest temperature setting, will automatically cut off the fuel supply 2, the most dangerous place is the ignition system boiler system , because many of these conditions could not be controlled once the ignition, so the first firing of the furnace should be purged to avoid residual combustible gas combustion furnace, after the purge, ignite pilot fuel (oil or gas) flame monitor reflects the flame existence, and it continues to burn about 10s. After 10s, the main fuel valve (oil or gas) driven i.e., ignite the main burner. If the normal main burner combustion, the ignition system is automatically shut down. 3, turn off the boiler system we know if it is to continue to provide fuel to the furnace in the flame will cause serious consequences of an explosion, this one so fast Henan party made a special detection device, or burn when the ignition fails halfway flameout, general in the 5S (ignition) or the 10s (runtime) off oil, gas solenoid valve, with sound and light alarm signal. 4, via the feedwater system to a steam cycle water injection drum seat, gall direct flame furnace, the flame furnace heat absorption, the heat absorption of smoke tube furnace high temperature flue gas discharged water, boiler water becomes progressively heated steam, by after separation water separation means leads from the main steam valve. Henan party fast as a professional gas boiler manufacturer, has 70 years of design and manufacturing experience, customers throughout the country, the most recent of several large cooperative enterprises and 10 tons of gas hot water boiler, Zhengzhou University, Zhengzhou Yutong Bus with 10 tons of gas hot water boiler, Gongyi aluminum plant with 10 tons of gas fired steam boiler, your trust is fast Henan party's power in the service of idealism Henan party fast, quality-oriented principle never live up to your commitment to your trust!

Food is food industry is human life industry, but also an ancient and eternal evergreen industry. Industrial fired steam boiler as an integral part of the chain, is mainly used for processing of distillation, extraction, sterilizing, drying, curing and other processes. Anqing City, Anhui Province is located in the Want Want Foods Co., Ltd. mainly engaged in all kinds of puffed food processing and manufacturing and sale of steam boiler steam delivered directly or indirectly in contact with food, thus requiring the steam quality is very high. Due to expanding production needs, Want Want Foods in urgent need of a boiler plant to provide high-quality steam. After a comprehensive understanding of the boiler industry, determined to cooperate with the fast boiler. Want fast square perennial cooperation with the country's food company, it has considerable experience of cooperation. By understanding the needs of the Want Want food production, providing a whole 10 tons of steam condensing gas steam boiler (WNS10-1.25-Y.Q).

Other Products