Industrial Best Gas Steam Boiler


Industrial Best Gas Steam Boiler

Process safety valve check valve gas industrial best steam boiler is one of the three safety accessories gas steam boiler, when the boiler pressure is too high, the pressure relief valve will automatically exhaust, gas steam boiler is the important safety equipment . The case of a new installation, overhaul, lack of consumer safety valve shutdown and restart more than three consecutive months, have had to re-check safety valve, safety valve to ensure accurate and reliable by the company safety officer, boiler technician, run operators, maintenance personnel together with the completion of the adjustment. Valve adjustment procedure is as follows: 1, the steam boiler when the gas vapor pressure close to the operating pressure of the safety valve, and retest check valve to the air motor exhaust, drainage accident flexibility and reliability of the electric valve, and the panel reinspection situ pressure gauge, the water level of accuracy, such as failure, not allowed to heat the school. 2, ready to call and check the quality of communication tools, a signal indicating whether the good. 3, adjust the safety valves, boiler pressure should be kept stable, pay attention to monitoring gas steam boiler drum level, and maintain normal. 4, steam boiler safety valve to adjust the pressure gauge in place of instructions shall prevail. If necessary using 0.4 or more for the accuracy of the gauge. 5, adjust the safety valve should be carried out only by descending. It should checksum gas steam boiler tuning high pressure safety valve, after the school seizure of the entire set of low pressure relief valve. 6, the following should be in the 0.3MPa, the movement preventing measures must do a good job of setting relatively low pressure steam boiler safety valve safety valve before adjusting. 7, by combustion, and exhaust steam adjust the degree of opening to the air slowly and smoothly up to the required setting pressure. 8, when the gas pressure steam boiler safety valve set pressure to rise if action is normal, then the action and reseating pressure values ​​recorded. If action is not correct or not action should be immediately opened to the air exhaust valve, while the combustion boiler weakened, stop boost, and buck 0.3MPa or less, re-adjust the boiler technician as required by maintenance personnel, until the compliance date. (Lead or lag 0.05MPa action is normal). 9, after the completion valve to adjust gas steam boiler, boiler 0.3MPa or less down to the lifting device and can be installed and fastened to the protective cover, a braking measure required under check valve removal, then Articles 7, 8 verify until all required safety valve calibration check is completed. 10, the safety valve to adjust the gas boiler, check the results recorded in the "safety valve to adjust the recording Visa" within the participants should verify the signatures and Internet safety valve input to the corresponding data in the ledger. During operation gas steam boiler, not only to regularly check on the safety valve, at the same time, we must regularly monitor boiler inspection to ensure that the boiler fully meet the safety requirements!

When using a chemical plant boilers have what precautions when using chemical plant boiler what precautions? The main industrial production of industrial boiler to provide heat to maintain the power production plant operations, mainly using a industrial best steam boiler of electricity or natural gas industry, the other is based on coal as a raw material by the waste heat recovery operation to maintain the production of traditional electric power industrial boilers, widely used in industrial production. What precautions when using chemical plant boiler? (1) When using industrial boilers, the operator should not only have relevant operational knowledge and skills, but also prohibits unauthorized departure, the boiler is no state in the operation to reduce accidents. Pressure boiler boiler water level is too high or too large. (2) staff to improve the working pressure of industrial boilers, should undergo a rigorous technical evaluation of relevant professional departments, before adjustments. Pressure gauge and safety valve to avoid failure resulting industrial boiler overpressure mislead the operator allowed to adjust. Meanwhile, to strengthen skills related to operating personnel, the timely processing of boiler operation anomalies. (3) prior to use industrial boilers, the boiler should be fully checked structure and current and voltage is within the normal range. To avoid unreasonable boiler structure, poor weld quality, safety accessories related failures caused by industrial accidents occurred in the boiler during operation, and should be sufficient for boiler water treatment prior to use to reduce the incidence of accidents in the run and run.

0.5 tons gas boiler introduced: 0.5 tons of gas boiler Description: 0.5 tons of gas boiler imported burner, automatic programmed control, automatic purge blower, electronic auto-ignition, spontaneous combustion and gas, (air) automatically adjusting the ratio of wind oil good atomization, combustion, low NOX, energy saving and environmental protection. Under normal circumstances, when the boiler steam pressure reaches the set value, the burner combustion is automatically stopped, when the steam pressure is below the set value, the burner is automatically started. When the abnormal phenomenon of the fuel, air intake, fault lights, the output sequencer will immediately stop the fuel, burner shut down automatically.

Cade Shopping Mall is located in central Shanghai Hongkou District, Shanghai Daily larger flow of people in the region. The introduction of Shanghai air pollutant emission standards, boiler flue gas emissions of nitrogen oxide emissions to less than 80 mg / m, Shopping Mall a coal-fired boilers have been used for many years, NOx emissions far super to this request, the urgent need to replace more environmentally friendly low nitrogen emission boilers. Other units through the use of fast Boiler introduction and understanding, determined and fast boiler to achieve cooperation, party fast to their specific needs to recommend one condensing gas hot water boiler of a 4.2MW for heating needs of the shopping center.

Other Products