Heavy Oil Fired Hot Water Boiler Laundry


Heavy Oil Fired Hot Water Boiler Laundry

How to prevent fired hot water boiler laundry hot water boiler explosion belongs to special equipment, but also a high temperature and pressure of thermal equipment, there will be some failures during operation, these are normal, but if not handled properly heat is likely to occur water boiler explosion. So, for safety equipment and personal safety, we have to understand some common sense prevention hot water boiler explosion. 1, the hot boiler explosion accident prevention boiler in strict accordance with GB50041-1992 "boiler room design specifications" of the design should be in thermal calculation and strength calculation, structural arrangements should be fair, the selection should be qualified. Manufacture of boilers, construction plans should ensure compliance with national quality boiler scale delineation. Boiler safety accessories should be complete, agile and reliable, and maintenance schedule, often check on the failure of the annex should be replaced. Maintenance schedule by part of the boiler to the boiler, external maintenance, the existence of a timely topic for repair and reconstruction, to ensure test quality. 2, fuel, gas hot water boiler furnace explosion prevention hot water boiler furnace point to double-check each gas line, oil line is tight (leak), pressure is normal, Installation and reconstruction of new oil and gas pipelines necessary to purge and clean. Check the ignition lead before the drum whether the fan has to take the air 5 ~ 10min, after ignition failure to analyze the reasons, then the ignition process to take the air ignition. Boiler use permit and inspection certificate did not apply for the boiler, furnace stokers right to refuse point. Enterprises should have a great fireman layout of manipulating evidence of experience points furnace fireman, fireman staff should strengthen the inspection tour, identify problems in time to prevent stalling, stalling once found, should immediately cut off fuel boiler installation should be controlled protection, including automatic ignition , flame protection, automatic adjustment of combustion and the necessary alarm chain protection.

Matters needing attention in loading and installation of Gas-fired Steam Boiler

Gas-fired steam boilers are a very wide range of special equipment, usually built in boiler rooms. However, in the process of loading and installation, some problems must be paid attention to, otherwise it may cause a certain degree of economic loss.

1. Pay attention to the following matters during the loading and unloading and handling of gas-fired boilers: the lifting capacity of the lifting equipment should match the weight of the lifting boiler. The lifting lug on the boiler with the lifting lugs that cannot be used for lifting can not be used for lifting. The length of the steel cord should be reasonably selected to avoid the scratching of the furnace due to the improper length of the steel cord. The boiler must be protected from any damage during handling and handling.

2. Reserves for maintenance space When installing boilers, ensure that there is sufficient maintenance space around the boiler.

3. Setting and precautions for the base and base of the gas steam boiler The boiler body must be installed on the basis of 100-150mm above the floor of the boiler room. It must be confirmed with the technical personnel of the boiler manufacturing company in advance and constructed according to the basic drawings. The anchor bolts must be reserved on the foundation. The foundation shall be capable of withstanding the maximum weight of the boiler and the amount of water it holds. When installing the base, you must first position it. After positioning, adjust to the same length of the two diagonals of the base, and then tighten all the fixing bolts. The installation of the base is carried out with reference to the reference line.

4, general precautions Be careful not to tilt and impact the boiler and accessories too much. No combustibles can be placed around the boiler. Do not use oil and water to smother the boiler. The boiler should normally be installed in a separate boiler room. The new gas-fired boiler room should not be connected to the house. The boiler room shall not be connected to Class A, Class B and Category C fire hazard rooms using flammable liquids. If connected to other production plants, the application firewall is separated.

In 2018, Xinjiang Uygur Autonomous Region is located in Changji City, conscientiously carry out the central environmental inspectors look back to work, determined to win the battle pollution prevention and control, through the implementation of remediation coal-fired boilers, industrial mentioned standard treatment, clean energy alternatives, smoke dust pollution control and many other measures to make the city's ecological environment has been continued to improve air quality.

Since 2018, Changji City in order to improve environmental quality at the core, the central environmental supervision as an opportunity to take environmental protection interviews, special inspection, etc., to strictly implement the main responsibility for environmental protection and various functional units of the company, by continuing to carry out law enforcement inspection, crack down on destruction of the ecological environment and harm public health violations, to further improve the regulatory environment grid system, to fight pollution prevention battle. 2019, Changji City to further increase the transformation efforts "coal to gas", "coal to electricity" and other areas, have been in Town sulfur heating station implemented the "coal to electricity" project, Onishi canal Heng Xin heat, Motor City nine branches, the benefits of grain and oil company implemented a central heating alternative project, blue mountains Tunhe polyester company implemented the "coal to gas" project.

Vertical gas oil fired fired hot water boiler laundry in the process of buying you buy gas hot water boiler, the professional encounter problems. Here, the authors analyze them with you. Gas hot water boiler is the number of how many RMB yuan required by the gas hot water boiler, burner desired, RMB number, random (circulation pump, control panel, valves) how much RMB synthesis. To choose how many factors renminbi gas hot water boiler needs, effective include: Name mutually exclusive, factory production, production capacity methods, testing, program design, selection of steel and so on. Among the most important factors are as follows: productivity source manufacturers ㈠- production plant productivity, will definitely be selected, quality goods. Due, a productive unit, not only to enjoy more the proportion of the market, accounting for a myriad of experience. Outside, In addition, the authority of product design technology. The size of the design level, quality of goods and the pressure is quite big. Directly or indirectly affect the reliability of goods subsequent use, energy efficiency, credibility, and good operational level. Choice of 2 steel steel grade specifications, is the cornerstone of goods production capacity. Excellent formal standard steel, sealed a solid effect of the gas hot water boiler ensured. Unsafe or non-standard steel plate used in many small brands, will cause gas hot water boiler of goods, poor reliability, high energy consumption, in addition to this there is a certain credibility inconvenience, with the operator, for example, even if modest framework procurement costs, but Pearl bomb bird. Ⅲ- automatic production capacity level of gas hot water boiler developed manufacturing time in, fuse, rolling, cutting, the most important method. Of these three methods, if you compare it certainly is artificially controlled, fully automated development, highlighting strengths are distinct. ISO due to production, have increased accuracy, minimal deviation. This is also a big name gas hot water boiler of goods, an important factor smaller than a name. Due to its production capacity last, but then closer to the level of program design, good success reached formal standard setting. Inspection procedures Ⅳ- some factories in China, there is very little gas hot water boiler through rigorous goods, factory technology testing. Stress testing is complete, the goods as excellent. This is definitely working methods fulfill responsibilities very seriously. Excellent test program, comprising at least about: Stress Test experiment, experiment inert gas, the test weld seams, the sealing of the test, there is a trial period cycle. Indispensable, indispensable. Only in this way will ensure excellent goods to the operator, so that operators in the subsequent use, avoid substandard goods produced, pressure to the operator's normal production and operation. Grade ⑸- repair maintenance of most of the smaller brands, there is very little maintenance repair and maintenance. Sale are entrusted to act as agent. However, most of the agents, and there is no authoritative professional strength team. After the failure to produce, will have repeated prevarication, or simply can not solve the consequences. Above, summarized, gas hot water boiler how much the yuan, the stress factors. Now normally, there are outstanding, how many yuan sophisticated gas hot water boiler needs goods, plus gas hot water boiler burner, most in per ton, $ 100,000 or so.

Other Products