For Sale Gas Fired Steam Boiler


For Sale Gas Fired Steam Boiler

How to maintain the boiler shutdown? After boiler shutdown cooling, heating surface must be thoroughly cleaned of fouling and ash grate the upper, the lower portion of the furnace. Then to maintain a certain degree of natural ventilation flue. In general, in order desiccant moisture should be placed in the furnace, flue. The quicklime as a drying agent, within the furnace or flue gas per cubic meter should be placed generally about 3kg. After placing all the ventilation should be tightly closed doors. After the change of lime powder to be replaced. Low-lying position as boiler room, ground during shutdown severe flood tide, often approach should be used and placed a small fire to dry desiccant combination. How to care? If the boiler shutdown a long time, the boiler shutdown after complete removal of soot coated with an anti-corrosion red lead paint in oil or other metal surface furnace. As internal corrosion Maintenance shutdown of the boiler body, under normal circumstances, can be used wet shutdown maintenance is not more than one month, one month electrically operated for sale fired steam boiler should be taken to dry more maintenance. To note the following problems when a dry maintenance: desiccant boiler not in direct contact with the metal surface, may be mounted in a container such as the iron plate after the desiccant is placed, and a hole for shutting the other hand hole cover.

What if there is wear and tear in the natural gas boiler? Detailed inspection is the key, as is fuel management. According to the operation condition and time of natural gas boiler, we can plan reasonable wear inspection. When using fuel, we strictly control the granularity of coal and limestone. The size of bed material should be strictly controlled. Boiler waste should be disposed of. The waste residue of the boiler must be treated before it can be discharged. Natural gas boilers should be installed where heat is used, easy to install. The hot pipe should not be too long. It should have a good insulation. The pipe shall be tilted properly from the hot water outlet to the end. The water supply source shall be equipped with a control valve. To discharge exhaust gases, the chimney of the natural gas boiler should extend to the outside and the outlet should be 1.5 to 2M higher than that of the boiler. If we want to reduce the influence on the water wall tube, we can adjust the air pressure and air volume properly, and effectively reduce the wear of the water wall. Check time is usually standby or downtime. Items to be examined include wall wear, furnace sealing and smoke leakage. In case of wear and tear, repair and welding are required to ensure the normal operation of for sale fired steam boiler. Generally speaking, before combustion of natural gas boilers, fossil fuels, fossil fuels and bed and circulating materials should be filled in the combustion chamber at wind speed and strength. And stiffness of the air convection under full integration. Furnace bottom air device, inner core area upward. The movement in the outer ring region flows downwards along the water wall of the furnace, thus prolonging the residence time of the coal particles in the furnace. Mineral particles, a large number of ash powder and smoke contain a large number of fly ash particles, these continue to lead to rapid wear of water-cooled wall tube, make wall thickness wear thin, resulting in wear.

The fast boiler related personnel monitoring center, started after the boiler, the boiler pressure, exhaust gas temperature and other sensors will automatically collecting various kinds of boiler operation data and real-time transmission through the mobile network to a remote monitoring center located at the headquarters of the fast boiler ; operating data once abnormal or deviation, the monitoring center monitoring personnel can detect and organize experts to analyze and issue alerts and corrective measures.

Gas-fired for sale fired steam boiler steam boiler which has the advantage compared to ordinary? With the fog and haze over the ongoing frequent occurrence, people on the importance of protecting the environment is also a new understanding of traditional coal-fired steam boiler is also limited policy, many basically let the big cities now use coal-fired steam boilers, and many areas have begun to work coal-fired boilers, low gas and steam energy saving my company's research production of boilers, environmental protection, operating costs, welcomed by the market. Energy conservation, environmental protection relative to conventional convenience I produced gas steam boiler Gas steam boiler advantages are: 1, 0.5 tons of gas steam boiler steam from the ignition to just 2-3 minutes, while the average gas steam boiler needs more than 20 minutes. 2, gas steam boiler compact, small footprint does not need to build the boiler room. 3, and does not require government departments to deal with, because the normal water level of the water capacity of only 27 liters of gas steam boiler is not within the range of technical safety supervisory inspection of the boiler, the boiler does not need professional workers, a key to start fully automatic operation. 4, heating area, there are supporting economizer 2T, increasing the heating surface of the boiler, provide the working efficiency greatly save fuel. Low cost: Compared with the fuel gas steam boiler, electric heating steam boiler can be reduced by 30% of the fuel, a steam boiler heated area can reach 92%, coupled with a supporting economizer heat generated by the boiler can be sufficiently absorbed , significant savings in operating costs of the boiler corresponding to the call of the national energy saving, gas steam boiler new products in recent years come to the fore, not only do energy conservation, which also meets the requirements of industrial production of thermal energy, ordinary steam boiler replacement product.

Other Products