Drying Gas Boiler Dealer


Drying Gas Boiler Dealer

The picture shows the fast drying boiler dealer processing plant located in the plain areas, plus catch up period is for a residential area of ​​Beijing for the production of low concentration of nitrogen product water tube boiler heating in winter, as scheduled in 2018 to ensure that heating at the same time, to meet the 20 mg / m require extremely low emissions of nitrogen oxides, Beijing air emission standards applicable to other regions 30 mg / cubic meter.

After completion of the gas drying boiler dealer cleaning, be sure to use hot air to dry them, but not both for heating the furnace walls and other accessories, this is likely to have adverse consequences. Right way is to place an electric heater in the bottom of the gas boiler, heated.

Moreover, the provincial government in order to actively promote the drying boiler dealer "coal to gas", and also introduced various subsidy policies to alleviate the pressure on enterprises.

Gas-fired steam drying boiler dealer will need to follow those steps: Due to the special nature of dual-use oil and gas boilers, thereby preparing the initial installation and construction from its long-term project to the acceptance stage there will be any problem to pay attention to the need to comply with, what does? Gas-fired steam boiler needs to follow the procedure step by step to complete. In this process, the need to comply with, what does? Boiler installation and construction of oil and gas dual front, first in accordance with the procedures to handle boiler installation approval procedures, pending approval of Quality and Technical Supervision after!

Other Products