Diesel Fired Steam Boiler Manufacturer


Diesel Fired Steam Boiler Manufacturer

After a boiler shutdown, how maintenance? Technical personnel, the maintenance shutdown of the boiler, furnace maintenance is divided into external corrosion and pot. Corrosion maintenance pot, according to the duration of the shutdown has dry and wet maintenance maintenance two kinds.

Nine, damage to the furnace wall furnace wall is damaged phenomenon: There fall within Cleaner brick; furnace wall bracket, lifting pieces of brick arch shell or temperature suddenly rises, or even red-hot; care at the furnace wall, and the wall with the furnace asbestos exposure at the steel, the wall of the sleeve through a filler such large drop, resulting in excessive cold air intrusion of the furnace, the furnace temperature is reduced, to reduce the load of the boiler; furnace wall projecting serious split, in danger of collapse.

Basics 1 boiler maintenance, gas-fired boiler during operation Note the following points: (1) does not allow pressurized combustion gas boiler or furnace smoke, easy to burn out because stoker hole cover. Not on the bottom of the water (2) Gas boiler ground surface to prevent moisture corrosion. 2, gas boiler run every 2-3 weeks, should be checked once. 3, gas boiler run every 3-6 months after the shutdown should conduct a comprehensive inspection. (1) on the inside and outside gas boiler inspection, such as pressure welds, corroded steel inside and outside part of the phenomenon, if found should be repaired in a serious flaw, if the defect is not serious next time also to be shutdown to repair, if found when there is suspicious, but does not affect safety, records should be made for future reference. (2) can be checked and the water boiler primer coating to prevent corrosion. 4, gas boilers and boiler base paint at least once a year. 5, maintenance of gas boiler normally unused methods: dry and wet two kinds, one month shutdown, care should be taken dry method, wet shutdown can be less than one month regimen. (1) Dry regimen: the boiler furnace shutdown to discharge water, the inside completely remove the dirt, rinse, drying in the furnace with Weihuo (be careful not to fire), and a diameter of 10-30 millimeters block quicklime installed sub-plate, placed in the drum, without contacting the metal with lime, quicklime weight, calculated to the drum 8 kilograms per cubic meter volume, and then all of the manhole, the pipe valve closed hand holes, each of three months, check again, such as lime ingredients like broken, i.e. the need to replace, should be re-run the boiler and the lime disk unloading. (2) Wet regimen: After Shutdown of the water discharge released, the internal completely remove the dirt, rinse, refill treated water to the full, the water was heated to 100 deg.] C oven, so that the water discharge gas outside of the furnace, then close all the valves, cold climates where moisture can not support the use of law, so as not to damage the boiler furnace water freezes.

Wuhan Yu Dahua Group Co., Ltd. is a cotton based, weaving, knitting and textile car decoration installation in one of the cross-industry, diversified and comprehensive export-oriented enterprise groups. 2017, the Group expanded production scale textile processing, the number of new production lines, the Group's original diesel fired steam boiler manufacturer can not meet the growing demand of orders in urgent need of a new steam boiler purchase. When selecting vendors steam boiler, the boiler output device side fast sustainable high quality steam attracted, decided to cooperate with the fast boiler. Fast art by side to the user site needs analysis, to provide two integrally condensing gas steam boiler (WNS4-1.25-Y.Q).

Other Products