China Oil Boiler Manufacturers


China Oil Boiler Manufacturers

The reason the gas china boiler manufacturers burner increased noise analysis when making use of the gas boiler and found this small fire normal, but this time turn the fire, extinguished or flashing instability. First speaking, that is because of this fire damper of the air volume setting is too large; i.e. after an oil fire because the micro-switch valve (damper outermost that group) inappropriate setting (set lower than the fire damper of the air flow larger) burner gas noise increases, mostly because the oil shut-off valve which is closed or lack of oil into the oil filter clogging; or, this is because of low temperature into the oil, the viscosity is too high or the pump into the oil temperature is too high; oil pump failure; fan motor bearing damage; there is because the fan impeller dirty equipment resulting in large noise. The above-described failure when using gas boiler, but also because the viscosity is too high oleaginous easy to be atomized (heavy oil); cyclones and because improper disc and the nozzle pitch; Note that because the fire is worn or dirty nipple; also because this preparatory tank the heating temperature is too high, causing the oil pump oil feed steam does not conform; or because the fuel inside the boiler resulting aqueous oil. When the above-described fault gas boiler used to perform this process, the test should be done gradually decreases; after heating temperature should be; adjusting the distance (between 0 ~ 10mm); clean or replace; is set to about 50 deg.] C to about; or drain oil change.

The price of 1 ton of diesel steam china boiler manufacturers how much? Diesel fuel boilers name suggests, is a diesel fuel as a boiler, in general belongs to a diesel boiler is oil-fired boiler series, you can also burn heavy oil, waste oil and other oils. Diesel boiler works mainly by the diesel burner (atomized) is injected into the combustion liner, into the flue gas back to the combustion chamber around the lower part of the smoke tube, forward to the front smoke box, smoke tube folding the upper, front to back It flows into the smoke box, through the chimney into the atmosphere. The price of diesel boilers have a lot, but the difference between what it? Here Henan party fast as a veteran enterprise for everyone under the doubts, the main part of the boiler refers to diesel burner, because they want to go with burner according to the viscosity and calorific value of burning oil, so the price difference is mainly in this, Henan side uses fast Italian imported burner compared to other conventional burner following advantages: 1, by volume petite we know the burner mounted in the side wall and the center distance ships diesel burner installation is not less than 1 1.2m ~, smaller volume so that the installation easier and faster. 2, stable performance increase wind speed exit back to improve combustion efficiency, good burner does not need to apply debugging, and some common die. 3, the combustion load bearing capability can bear the name suggests is a heavy load without damaging the load, but not always.

Fuel gas-fired china boiler manufacturers installation steps Many users in the purchase of fuel gas-fired boiler fuel gas-fired boiler installation step is not clear, here we introduce to you in detail under the fast sale of shares by Henan side: We all know that the installation of the boiler is in line with national needs promulgated regulations to execute the regulations GB50273-98 "industrial boiler installation engineering construction and acceptance", but we should also note the following in the installation of several points: 1, the first part of the underlying foundation of compacted dust do, then start concreting and tiling, to try to make level, the maximum error of boiler placed inclination of not higher than 5mm, anterior need to open up a sewage tank. 2, the oil pipeline supply line is installed through the boiler plant, a senior technical staff installed a boiler factory is to have a portable installation instructions. 3, the combustor burner installed in the supply line the same as the factory mounted directly on the boiler, so this does not require the installation site 4, piping, valves, meters, accessories mounted fast due Henan local production of fuel gas boiler packaged boiler, so these are also in the factory have been installed, but because these instruments are not precision instruments collision, it will affect its accuracy, it is necessary to gently, the installation process must be careful. More questions about the installation of fuel gas-fired boiler, please contact customer service online!

Directly under the Central Government Offices Administration (referred to as the straight Authority) is the CPC Central Committee and subordinate units, are responsible for the CPC Central Committee and services for the organs and services, an important function of serving the people. Central Government institutions funds, finance, public service vehicles, the state-owned assets and real estate management, service management is responsible for the specified life of the party and state leaders as well as services related objects.

Other Products