500Kg Oil Steam Boiler


500Kg Oil Steam Boiler

Hefei Limin Pharmaceutical Co., Ltd. Nanjing Military Region, formerly the backbone of pharmaceutical companies, the main drug is slowly swallow rather teabag, relying on advanced R & D platform to carry out contract manufacturing, OEM OEM and other business cooperation. China's environmental protection development trend began to take shape, many environmental policies have been put forward for a positive response to the national environmental policy, Limin Pharmaceutical decided to introduce a gas station 500kg steam boilers. After an investigation of the boiler market, Limin Pharmaceutical fast boiler is strong comprehensive strength and wealth of experience working for many years in the pharmaceutical industry to attract, party fast according to the actual needs of customers for its recommendation of one of Taiwan 4 tons of steam condensate gas-fired steam boiler (WNS4-1.25-YQ).

Steam boiler rules Henan fast boiler with small series to introduce the company's 500kg steam boiler operating procedures. First, the components of the steam boiler before oven cooking oven and check (a) and oven cooked boiler furnace must be checked in detail. Check the following items: 1, cold chain grate test more than 24 hours, cold test should meet the following requirements: (1) grate should be smooth turning chain wheel axle, found arched, two tension bolts can be tightened. (2) the active grate sprocket good occlusion. Minimum gap (3) on both sides of the active grate block with the side seal and the side seal angle not less than 6 mm. Distance (4) on both sides of both ends of the furnace grate platoon leader pin in the sprocket should be kept equal. If it is found at one end to the occurrence of side friction, long waist-hole may be a tap with a hammer, the end surfaces on both sides remains equal distance. (5) steam boiler grate rotated without jamming, deviation phenomenon, when the deviation found by the inspection hole into the rear grate tail, the tie bolt align the two bearings of the drum, deviation phenomenon can be eliminated. The boiler has ignition combustion, still need to transfer found Hearth n, just before two adjustable chain tensioning bolt shaft directly outside the furnace, but preceded align the front sprocket shaft and a gearbox connect the safety pin or bolt removed until after squaring shaft to a gearbox with a chain alignment pin or bolt after tightening, may otherwise result in misalignment with the sprocket shaft of a gearbox and mechanical damage. (B) Check broken grate furnace platoon leader pin is bent, if long waist hole in the furnace may be carried out at any time platoon leader pin alignment reload. (C) a chain grate does not allow foreign matters (such as bolts, nuts, nails and other iron) is present. (D) firing door open and flexible, easy to open and drop the shutter coal, coal gate left and right side of the grate surface distance equal to, the thickness of both sides of the seam to ensure equal furnace, as a method for reducing ranging from links available to make equal, coal shutter cover plate should cover tightly to prevent leakage into the coal, coal stuck shutter. (Five) of each grate windshield of smoke damper and damper adjustment inside the flue flexible switch. (Vi) blower, Fan, Java machine, commissioning normal water supply equipment. (Vii) manhole, hand hole is tight, attached parts fitted Ge are complete. (Viii) the furnace wall is normal, the flue is tight. (Ix) steam boiler pipes, water pipes, sewage road is complete. (J) all filled with lubricating oil in the bearing housing and oil cup. (Xi) All electrical equipment should be empty running test, inspection equipment, and other electrical lines is intact.

Determine the location of the 500kg steam boiler room siting what issues need attention 1, boiler room refers to the building design boiler and ancillary equipment, water treatment facilities, pumps and sub-steam (water) tank and the like. Boiler should be separate and independent from other buildings. Boiler room should not be set directly in crowded places (such as public bathrooms, classrooms, restaurants, auditoriums, shopping malls, waiting rooms, etc.), or at the top, bottom, or the immediate neighborhood of the main evacuation port on both sides. 2, the new boiler room should not be connected to the house. 3, provided in the boiler room such as a semi basement layers or high buildings or the first layer must meet the following conditions: (1) each steam boiler rated evaporation does not exceed 10t / h, steam pressure does not exceed the rated 1.6MPa; rated each water boiler (including direct fired absorption chiller-room unit) does not exceed the output 7MW, the rated water temperature ≤95 ℃. (2) Each steam boiler must have a reliable overpressure protection interlocking means interlock protection device and the low water level. (3) accessories and safety interlock protection device for each boiler to regular maintenance and testing to ensure that sensitive and reliable. (4) the building structure between the boiler should have the appropriate proof Measures. (5) operate independently of the fireman who must hold the appropriate level of operating permits fireman, boiler and continuous operation of the same class more than five years, has not been an accident. (6) There must be safe evacuation routes. 4, should not be located in the boiler room or a high-rise multi-story building basement, an intermediate floor or roof, but the conditions required setting time, shall meet the requirements of paragraph 3, the first gist of the present, should meet the following conditions, and former boiler room should be set prior consent districts of the city and over special equipment safety supervision agency: (1) steam boilers rated evaporation each no more than 4t / h, rated steam pressure does not exceed 1.6MPa; each heat rated water boiler (including direct fired absorption chiller-room unit) does not exceed the output of 2.8MW, the rated water temperature ≤95 ℃. (2) must be light oil, city gas, natural gas as fuel or electric heating boiler. Underground boiler room non LPG gaseous fuel or a density greater than 0.75. Connection (3) using a fuel supply pipe welding backing. In addition, when set in the basement boiler room, blowdown or appropriate measures should be set up sewage. When using gas as fuel, the exhaust system is also provided accident. 5, not connected to the boiler room A, (B) and (C) a liquid combustible fire risk room. If connected to other production plants, application firewall separated. Waste heat boiler is not so limited. Boiler production plant belongs to class D, between the fuel tank, between the pump delivery room Class C production, between the gas regulator belonging to the delivery room A of production. 6, between the outer wall or roof of the boiler should be at least equivalent to 10% of the area between the boiler pressure relief area (such as windows, skylights, shutters, etc.), and the relief port should avoid crowded places. 7, boiler room should be equipped with emergency lighting and evacuation signs, emergency lighting voltage shall not exceed 36V.

Xiao Bian now introduce gas 500kg steam boiler classification accuracy and precision hydraulic machine Henan fast boiler's steam boiler gas and hydraulic classification of a gas steam boiler By Type 1, an industrial gas steam boiler: heating and for industrial production and so on. Most of the parameters for the low, low capacity boilers, the fire bed combustion and thermal efficiency is relatively low. 2, power station boilers: mainly for power generation. Most high-parameter, large-capacity boiler, firebox and allow more efficient combustion. 3, the ship's boiler: a marine power. Such boilers generally low parameters, fuel oil, the requirements of small size, light weight, easy to move more. 4, locomotive boiler: The main use of locomotive power. Lower overall parameters are small capacity boilers, fire bed combustion, requires compact, movable. Two gas steam boiler in accordance with the kind of the working fluid and an output state classification can be divided into: 1, the steam boiler: the working fluid is steam outlet. 2, hot water boiler: hot water as the working fluid outlet. 3, special working fluid boiler: export of special working fluids, such as certain organic matter. Three outlet gas steam boiler in accordance with the pressure of the working medium can be divided into: 1, pressure boiler: the outlet steam pressure 14MPA (140kgf / cm). 2, high-pressure boiler: the outlet steam pressure 10MPA (100kgf / cm). 3, sub-pressure boiler: the working fluid outlet pressure of 2.5MPa. 4, pressure in the boiler: the outlet steam pressure of 3.9MPa (39kgf / cm). 5, supercritical pressure boiler: outlet steam pressure is about 25MPa (about 250kgf / cm). 6, subcritical pressure boiler: outlet steam pressure of 17MPa (170kgf / cm?). 7, low-pressure boiler: the outlet refrigerant pressure (gauge pressure) is less than or equal to 1.3MPa (13kgf / cm). Accuracy of the hydraulic machine, determines the precision of the parts. However, only static accuracy to measure the level of accuracy of press is not very accurate. This is because the size of the mechanical strength of the press itself has a great influence on the punching accuracy. If the strength of the press itself is low, the machine will be modified such that the pressure at the instant of Ao punching pressure is reached, so that, when the above-described conditions in a static tune even good, also since the strength of the deformation caused by the sample bed, differences occur. This indicates that the accuracy of the press and has a lot of strength, and the magnitude of the intensity of the work has a great influence on the press, so that high-precision parts and punched continuous strong cold stamping, the accuracy must be selected high, and the rigidity of the press.

Other Products