5 Mw Gas Boiler In New Zealand


5 Mw Gas Boiler In New Zealand

Environmental 5 mw boiler in new zealands using different fuels What are the advantages first to show that environmentally friendly boiler is a more general concept. It is not classified according to the fuel used, but to a variety of standard boiler flue gas emissions to meet state regulations. So what are environmentally friendly boiler fuel to use it? Commonly used natural gas fuel, diesel fuel, electricity, methanol and the like. Natural gas is the most important environmental protection boiler, its fuel natural gas is a clean energy, combustion products discharged after treatment safety. Natural gas boiler maintenance costs of environmental protection is very low compared to the energy efficiency of is very high, such as our gas-fired thermal efficiency can reach 95%. This boiler is the government's most important eco-friendly boiler. Environmental protection boiler fuel diesel fuel use in general, because of the relatively low price of diesel, sulfur dioxide and other acidic substances produced by burning it after treatment can be safe discharge standards, supporting measures that it needs storage tanks, maintenance costs are lower thermal efficiency up to 90% or even higher. Electric heating boilers are environmentally friendly boiler, wire and cable facilities is required, it is zero pollution, low maintenance costs, but the state has requirements of energy conservation, power cuts in some places the situation may occur, especially in summer the peak period. This is also where you need particular attention. High energy-efficiency boiler hot methanol, facilities storage tank is required, but also the Government's strong support for environmental protection boiler.

[6], oil-fired 5 mw boiler in new zealand, must configure a more complex fuel system (especially the combustion of heavy oil, while residue), such as tanks, pumps, filters, heat pipes, etc., must occupy a certain space, and gas boilers, then No configuration caisson. The access network can simply supply gas conduit, of course, need to set the pressure regulating means and a solenoid valve on the pipe, valve accessories cushion so as to ensure safe operation of the boiler.

Recently, the State Administration of China's market, the National Development and Reform Commission, Ministry of Ecology Environment jointly issued the "Notice on Strengthening Environmental Protection and Energy 5 mw boiler in new zealands" (the "Notice"), put forward specific requirements for environmental aspects of energy-saving boiler work.

"Notice" the implementation of the guidance, "the CPC Central Committee and State Council on the overall strengthening of environmental protection and resolutely fight tough fight pollution prevention advice" and other documents, adhere to safety first, prevention first, the five principles of energy saving, comprehensive management implement energy saving boiler from the production, import, sale, use and other aspects of business to post the main responsibility, and strengthen supervision and management of Eng environmental Protection in the "special equipment Catalog" range of boilers, and comprehensively promote energy-saving environmental governance boiler.

First, across the country, in principle, to a new 10 steam tons / hour of coal-fired boilers and, in key areas (and the surrounding areas of Beijing, Tianjin, the Yangtze River Delta region and Fenwei plain) and the rest of the city built the county level and above New District, in principle, to 35 tons of steam / hour of coal-fired boilers.

Second, the new coal-fired boiler emission concentration of air pollutants key areas need to meet ultra-low emission (6% on the basis of the reference oxygen, soot, sulfur dioxide, nitrogen oxides emission concentration of not more than 10,35,50 mg / m) requirements.

Third, the area reserved execution key boiler air pollutant emission limits or special places more stringent emission standards, 65 t steam / hour coal-fired boiler and above all of the ultra-low emissions and energy transformation embodiments, a low nitrogen gas boiler is substantially complete transformation.

"Notice" also stressed the upgrade boilers with energy and environmental conservation requirements. Boiler units to implement the main responsibility for ensuring that the boiler energy efficiency and emissions of air pollutants meet legal regulations, technical specifications and requirements of the relevant standards in China.

Fourth, for the boilers do not meet environmental requirements, and use shall take appropriate measures for improvement, if after rectification not meet the requirements, be allowed to continue to use.

Fifth, the boiler unit to apply for emission permits in accordance with laws and regulations, and to establish their own monitoring system, strict discipline and preservation of the environment management accounting, timely and relevant departments to prepare and submit emission permits implementation report.

Sixth, the boiler unit to promptly take the initiative to report the boiler equipment obsolete, and apply for cancellation of the boiler use registration shall not be obsolete boilers to move equipment or put into use again.

How to maintain the 5 mw boiler in new zealand shutdown? After boiler shutdown cooling, heating surface must be thoroughly cleaned of fouling and ash grate the upper, the lower portion of the furnace. Then to maintain a certain degree of natural ventilation flue. In general, in order desiccant moisture should be placed in the furnace, flue. The quicklime as a drying agent, within the furnace or flue gas per cubic meter should be placed generally about 3kg. After placing all the ventilation should be tightly closed doors. After the change of lime powder to be replaced. Low-lying position as boiler room, ground during shutdown severe flood tide, often approach should be used and placed a small fire to dry desiccant combination. How to care? If the boiler shutdown a long time, the boiler shutdown after complete removal of soot coated with an anti-corrosion red lead paint in oil or other metal surface furnace. As internal corrosion Maintenance shutdown of the boiler body, under normal circumstances, can be used wet shutdown maintenance is not more than one month, one month electrically operated steam boiler should be taken to dry more maintenance. To note the following problems when a dry maintenance: desiccant boiler not in direct contact with the metal surface, may be mounted in a container such as the iron plate after the desiccant is placed, and a hole for shutting the other hand hole cover.

Other Products