4Ton Coal Gas Fired Steam Boiler


4Ton Coal Gas Fired Steam Boiler

We produce 4ton coal fired steam boiler is a very important part of the device, this provides a quick way to our gas steam boiler, after use, we found an excellent energy-saving effect boilers, flue gas discharge temperature is lower than the previous boiler equipment many, in line with national environmental provisions of the boiler equipment. --customer feedback

Details of operation of the boiler details chemical energy chemical energy Note 1 Note that operation of the boiler, fuel delivery is controlled with respect to the thickness of the layer of coal-fired boilers, the actual operation, the particles of different sizes on the same coal seam, unreasonable distribution, uneven ventilation, combustion is not uniform. The method can be employed uniformly stratified combustion to coal, to improve seam incomplete combustion: first administration of large particles of coal in the lower layer, the upper layer after administration minimal, large particle surface area of ​​small particles of coal, the need to burn a long time, this time is in the air the highest concentration of oxygen lower position; the other hand, small particles of coal on top, large surface area, a low oxygen concentration, full use of excess air. 2, the flow regulating damper excess air ratio is too large, a large loss of smoke; excess air ratio is too small, incomplete combustion loss is large, and therefore need to properly regulate the air flow to minimize loss of two or more. Usually in the flue gas analyzer backpass smoke, the control amount of wind of carbon monoxide is reduced to a reasonable value. For unconditional for gas analysis, empirical judgment by the naked eye can see the flame in the furnace, the flame pale described excess air amount; brown opaque flame, smoke black smoke indicates incomplete combustion. 3, there is a 1mm thick scale surface water quality management experiment boiler heating surface, waste of fuel from about 3% to 5%, in the presence of 3mm thick scale, waste of fuel of about 5% to 10% [3]. Water two general steps: pre-treatment, ion exchange or reverse osmosis. 4, cleaning blowdown gray scale or fouling deposition in the heating surface, increased heat resistance, reduced heat absorption wall, to improve the furnace exit gas temperature, boiler output decreased, but to increase the amount of cast coal, causing furnace exit gas temperature further improve a vicious circle. Therefore, timely cleaning clear dirt is particularly important. 5, the energy efficiency of the heat insulation testing industrial importance boiler showed small boiler in the case of good thermal heat radiation loss is about 3%, if the wrong selection insulation material, the thickness is too small, or even damage, does not include local heat, heat losses will be higher, the boiler has been running, has been caused by waste heat into the air. When the shutdown check whether the furnace wall insulation bricks off; isolated brick flue check is complete, to avoid shorting the flue gas; outer portion boiler, steam pipes and other insulation damage to be repaired; when heat insulation, low thermal conductivity of the material ( i.e., materials with good thermal insulating properties) on the inner layer having a better thermal insulation effect; respond to the economizer outer insulating layer for laying under conditions permitting. 6, to solve the problem of air leakage air leakage boiler boiler unit during operation is a common problem, the need to ensure the tightness of the boiler, furnace air leakage above all, do not close the site to check the furnace wall, door, inspection holes, etc., can be candles law, candles near these places, to observe whether the candle flame inward deflection to judge. Second leakage tail heating surface, the flue stack leakage mostly welding cracks, elbow bend, the expansion joints wear wear; mostly air superheater corrosion or wear leading to leakage through the pipe, the boiler shutdown should focus an examination.

Food factory 4ton coal fired steam boiler should be noted that the ignition of the details need to pay attention when the details of the food factory steam boiler steam boiler ignition 1. food plant should be checked (including related accessories, Management) in front of a fire, and water supply. Before entering the water, the drain valve must be closed. Open air valve can discharge the boiler. 2, the treated water is slowly injected into the furnace, the inlet temperature is generally not higher than the boiler 40. When the water level rises to the minimum level of the water table, the water supply valve is closed, the stabilized boiler water level, the water level drops. With particular emphasis before the fire, you should check carefully the coal port and checkpoints in order to improve compliance with strict sealing conditions. Otherwise, it should clear the debris-side sealing surface, and a good gasket insertion, to ensure that meet strict sealing purposes. Since this is a forced air burner, during operation, gas leakage is not allowed, in order to avoid accidents. 3. When food factory fire steam boilers, open the bottom stoker grate and placed on the wood. After all the checkpoints closed, ignite the lighter. After strong fuel combustion, coal began to increase. When coal burning strong, continue to increase coal, closed after a stoker, hermetically sealed, turn the blower, so that coal continues to burn. burn. Strengthen the observation of the fire, the combustion gradually to normal.

About six tons of 4ton coal fired steam boiler shutdown of a temporary shutdown: It is planned, therefore slow cooling during shutdown protection device, it should also pay attention to safety, pause furnace according to the rules in Chapter IV Fenghuo (pressure fire) get on. 2, safety shutdown: care should be completely stopped even on normal operation plan for 1 to 3 months to be a shutdown, shutdown should maintain more safety injection apparatus, after the shutdown, and other water-cooled furnace to below 70 ℃ when they let go of the gas, open manholes, hand holes, rinse the pot with water scale. 3, emergency shutdown: the boiler operation, when the case of the following circumstances, should an emergency shutdown, and notify the relevant authorities. (1) expanding the cease-fire should first see if the water table level is called to take water law. If Inception water table, water cock side, and then close the steam cock, and then turn on the water faucet open and close repeatedly called after water, still can not see the water. (2) All water supply equipment failure. (3) All water gauge, pressure gauge, safety one of all the failures. (4) a boiler or furnace wall element damage, serious threat to the safe operation of the boiler, emergency shutdown, should focus on preventing the stop of the accident and the specific steps as follows: ① first blowing off; ② the coal on the grate red raking; ③ Close induced draft fan.

Other Products