15Ton Hr Oil Boiler


15Ton Hr Oil Boiler

To the end of October 2020 to complete Chaigai coal-fired 15ton hr boilers no longer give financial awards complement.

Further, out of the boiler removal methods include eliminated, an alternative centralized heating boiler, coal gas, coal to electricity, use geothermal, wind, solar, biomass with baghouse, clean coal to burn not including , CWS, anthracite, semi-coke, green coke, crude oil, coal-fired boiler removal must be removed chimney or flue physical cutting, it does not have the complex production conditions. Do not use has been shut down, eliminated waste coal-fired boilers to cash rewards and subsidies. In the process of new coal-fired boilers to switch to natural gas to be synchronized to achieve low nitrogen transformation.

Center back 15ton hr boiler combustion boiler is preferably small foreign structure, although the two-pass boiler, the heated area is small, but the use of the turbulator charming, the purpose of enhancing the turbulence of the flue gas, disrupt laminar flow boundary wall, reducing the thermal resistance, increasing the heat transfer coefficient, a smaller heating area to achieve the same high thermal efficiency. Lower exhaust gas temperature limit in theory, the exhaust gas temperature can be reduced to very low or even close to the ambient temperature, for maximum thermal efficiency. However, in practice, due to the reduction of the exhaust gas temperature, low temperature corrosion will cause, therefore, the exhaust gas temperature can drop too low, in order to ensure that the wall temperature is higher than the main boiler heating surface flue gas dew point temperature. Therefore, low-temperature corrosion has become a major obstacle to reduce exhaust gas temperature and improve the thermal efficiency of the boiler. Tail auxiliary heating surface increases, further reducing the exhaust gas temperature, fuel gas boiler SZS improve thermal efficiency because the oil, gas type SZS easy to burn the fuel gas boiler air preheater generally not disposed. The economizer means is a common energy, which can be recycled flue gas was able to effectively reduce exhaust gas temperature.

Burner What are the main components of the 15ton hr boiler burner, by definition, refers to the use of the burner on the boiler, boiler fuel gas-fired boiler burner is an important equipment. If the burner on strike, then the boiler will not burn up. Since the boiler burner is so important, we have to look at it part of it. See below: 1 air supply system. Function into the air supply system is to a certain wind speed and amount of air to the combustion chamber, its main components are: a housing, fan motors, fan impeller, air guns fire tube, damper controller, damper baffle, a cam adjustment mechanism, diffusion plate. 2. The ignition system. The function of the ignition system ignites the mixture of air and fuel, its main components are: the ignition transformer, the ignition electrode, a high voltage electrical cable fire. Flame length, taper angle, the shape of the design according to user requirements. 3. Monitoring System. Function monitoring system is to ensure that the burner safe and stable operation, the main components are flame detectors, pressure monitors, temperature monitors and the like. 4. The fuel system. Function of the fuel system is to ensure that the desired fuel burner. The fuel oil burner system are: tubing and fittings, pumps, solenoid valves, nozzles, heavy oil preheater. The gas burner mainly a filter, pressure regulator, solenoid valve, and then firing solenoid valve, the fuel valve. The electronic control system. Electronic control system is the command center and the focal point for the above system, the main control element is a control box, for different burner with a different programmer, common control box has: LFL series, LAL series, LOA series, LGB series the main difference is the time of each different program steps.

At the completion of the city's foundation 10 steam tons / hour and the coal-fired 15ton hr boiler Chaigai, and gradually expand the coal-fired boiler demolition and clean energy transformation range, before the end of 2020, the city planning area basically eliminated 35 tons of steam / coal-fired and boiler.

Xinyang, Henan decreasing year by year funding award boiler fill ways:

(1) the completion of the coal-fired boiler Chaigai before the end of October 2018, giving not less than 60,000 yuan / tons of steam financial awards complement;

(2) the completion of the coal-fired boiler Chaigai before the end of October 2019, giving not less than 40,000 yuan / tons of steam financial awards complement;

(3) complete Chaigai coal-fired boilers for the end of October 2020, the prize money will not give up.

At present, many City in Henan Province have been put forward relevant atmospheric Prevention Act, because the policy has landed Henan Province, allowances and Chaigai range of boiler Metro Toronto are the same.

Other Products