15T H Heavy Oil Boiler Systems


15T H Heavy Oil Boiler Systems

Reform technology of coal-fired 15t h boiler systems combustion mode retrofit of coal-fired boiler by means of this technology, proper pulverized coal can be injected into the proper position of furnace chamber, and appropriate suspended combustion can be added on the basis of furnace row layer combustion, which can achieve a certain energy saving rate. For fuel oil and gas-fired boilers, the old and backward burners can be replaced by new energy-saving burners.

Industrial gas steam 15t h boiler systems room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger.

PRODUCT INTRODUCTION fuel gas-fired 15t h boiler systems fuel gas-fired boilers and coal-fired steam boiler is not the same, gasoline and diesel and gas-fired burner must be poured into the fuel to the boiler furnace using a combustion chamber rather than grate facilities. Since the fuel gas-fired boiler is not easy to cause the fly ash lit, so no oil or gas boiler slag removal equipment. If mixed with air or exterminate within a certain range, it is introduced into the furnace petrochemical and gas easily the explosive. Thus, any gasoline and diesel and gas-fired boilers must be selected and automatic combustion control system. Compact boiler fuel gas, and the small boiler exhaust, drainage, control and auxiliary equipment installed at the distribution panel, and produce large and small boiler assembly. Fuel gas-fired boiler safety valve installation key point describes the installation of fuel gas-fired boiler safety valve sure to carry out in accordance with reasonable installation process, to prevent wrong and lead to risk. Fuel gas-fired boiler safety valve installation should pay attention to what matters? The following is a brief description: 1 oil-fired boiler safety valve having a lever bar to avoid self-weight and the mobile device guide body defining deviant lever, the spring valve lift handle and avoid the need for screw adjustment means random twist. 2. Rated evaporation than 0.5t / h gas boiler safety valve should be arranged at least 2, Rated evaporation gas boiler should be equal to or less than 0.5t / h, fitted with at least one safety valve. Separable economizer outlet and a steam superheater outlet valve should be installed. Sectional area of ​​the connecting pipe between the boiler safety valve 3. Fuel gas boiler can not be lower than the imported cross-sectional area of ​​the valve. If several valve mounted on each stub is directly coupled to the drum, the passage sectional area of ​​the stub is less than 1.25 times not all of the area of ​​the exhaust valve. 4. Oil and gas boiler safety valve should be mounted vertically in the height of the boiler drum and the header. Can not be mounted between the valve and the steam outlet conduit and the valve drum or header. 5. For rated steam pressure less than or equal to 3.82MPa boiler safety valve throat diameter of not less than 25 mm; the rated steam pressure is greater than 3.82MPa boiler safety valve throat diameter of not less than 20 mm. 6. Fuel gas boiler safety valve should normally be established an exhaust pipe, the exhaust pipe should be directly connected security grounds, and there is sufficient cross sectional area to ensure the smooth flow of the exhaust gas. The bottom of the valve should be equipped with an exhaust pipe connected to the drain of a safe place. Valve must not be installed in the exhaust pipe or drain pipe.

Recently, the Shuangyashan City, thoroughly implement the first meeting of the Central and the National Finance Committee, the province's environmental protection spirit of the General Assembly to further implement the "State Council on the issuance of winning the Battle of Blue Sky's three-year action plan" to do "atmosphere ten" task finishing verification and improve air quality living environment for the residents to protect the health of the people, combined with the actual situation, the specific "Shuangyashan City 2018 air pollution control implementation plan."

"Plan" focused on job content is to carry out comprehensive improvement of coal-fired boilers, effectively reduce coal pollution. Of built-up urban area shutdown, demolition, instead of using biomass fuel boiler inspection, investigation and comprehensive urban fringe areas built-up area if there is a new violation, missing, incomplete elimination of small coal-fired boilers, to eliminate incomplete, missing, "resurgence" boiler promptly dealt with severely, and formed out of work ledger, as planned phase-out. Existing "clear" action identified 28 small coal-fired boilers, before the end of September 2018, to phase out the "cleared" of work, and in strict accordance with the requirements "a furnace" during the establishment phase out the boiler archives for future reference. Planning the construction of central heating heat source, heat accelerate network construction and transformation progress, constantly expanding area of ​​central heating and central heating ratio; advancing coal to gas, coal to electricity and other clean energy alternatives, to promote industrial parks and industrial clusters concentrated heat source, steam source facilities.

Battle of blue sky and started "out of coal-fired boilers" special action to start the county (district) level urban built-up area of ​​10 steam tons / hour and coal-fired boiler, tea furnace, operating coal-fired kitchen stove and other facilities, grain storage coal drying equipment out of work. County (district) to co-ordinate well out of work, organized a special team completed a comprehensive investigation of the status quo area coal-fired boilers, establish a list out of coal-fired boilers, the production out of specific programs, and to work out the boiler out of subsidies. Before the end of the first to eliminate a large number of pollution levels, residents reacted strongly to the coal-fired facilities.

Other Products