10 Steam Tons Of Gas Boiler Price


10 Steam Tons Of Gas Boiler Price

Recently, the Changsha City issued a notice on the transformation of low nitrogen gas 10 steam tons of boiler price related documents. Details are as follows:

1, a total transformation time for two years, 2019-2020 years.

2, the transformation range: High-tech Zone, Furong District, Tianxin, Kaifu District, Yuhua District, Yuelu District administrative region, the city of hope Gaotangling Subdistrict high Tong Ling Area, Osan streets Yujia slope Area, Lake Daze in the region ban on burning streets, white sandbar streets, moon Island street, Jinshan bridge street, Golden Park street, Xingsha streets of Changsha County, Hunan Long street, Quantang streets, Langli streets, long queue streets, such as the scope of the existing town of Sha It is not less than 1 ton of steam (greater than or equal to the rated power or hot water boiler, organic heat carrier in the boiler 0.7MW) gas boiler (facility) (boiler equipment including special directory outside the range) low nitrogen unit owners embodiments transformation. Or more areas outside the area of ​​self-implementation.

3, the transformation of the standard limits: the new replacement and overall gas boiler Changsha NOx emission is less than 30mg / Nm³; gas boiler (facility) was transformed with the nitrogen oxides emission concentration of less than 50mg / m³.

4, 2019 Task: In addition to the Furong District, Yuhua District, within a range of high-pollution fuel combustion zone ban other jurisdictions to start the transformation from June 2019, 50% complete gas-fired boiler (facilities) low nitrogen transformation and complete acceptance.

5, 2020 Tasks: Before the end of October 2020 to complete all gas boilers (facilities) within the range of high-pollution fuel combustion zone ban on low-nitrogen transformation and complete acceptance.

You know how the 10 steam tons of boiler price works? Boiler parameters is a main boiler performance indicators, including the boiler capacity, steam pressure, steam temperature, water temperature and the like. Boiler capacity available rated maximum continuous evaporation or evaporation is represented. Rated evaporation under a predetermined outlet pressure, temperature and efficiency, the amount of steam per unit time of continuous production. Maximum continuous evaporation under a predetermined outlet pressure, temperature, per unit time the maximum continuous amount of steam produced. Steam pressure and temperature parameters including steam boiler, generally refers to a superheater, superheated steam pressure and temperature at the outlet of the reheater and superheater if no reheater, saturated steam pressure and temperature at the outlet of the boiler refers. Refers to a water temperature of the economizer inlet temperature, inlet temperature refers drum without economizer. Boilers can be categorized in different ways. Boiler use can be divided industrial boilers, utility boilers, marine boilers and boiler locomotive; by the boiler outlet pressure can be divided into low, medium, high pressure, high pressure, sub-critical pressure, the supercritical pressure boiler; boiler and by water flue gas flow path can be divided into the fire tube boilers, fire tube boilers and water-tube boilers, fire tube boilers and wherein the fire tube boiler and collectively shell boiler; press cycle can be divided into natural circulation boiler, auxiliary boiler cycle (i.e., forced-circulation boilers), and the combined circulation boiler once-through boiler; by combustion, the boiler chamber into the burner, and boiling Stoker furnace. Water vapor system, feedwater heated to a temperature in the heater, the water supply pipe into the economizer, after further heating into the drum, along with the mixing pot of water down to the water wall downcomer inlet header. Radiative heat absorbing soda water formed by the mixture in the riser in the drum reaches the waterwall tubes, the water from the steam separator means, steam separation. The separated saturated steam from the superheater to the upper stream drum, continue to become superheated steam endothermic certain temperature (most of the current 300MW, 600MW unit main steam temperature is about 540 ℃), and then sent to the turbine. In terms of combustion and flue gas system, the air blower into the air preheater is heated to a certain temperature. It is ground to certain fineness in the mill coal, a portion of the hot air from the air preheater carried into the furnace through a burner. Discharging pulverized coal burner and combustion air mixture is mixed with the rest of the hot air in the furnace and release large amount of heat. The hot flue gas flowing through the furnace sequence after combustion, Slag bundle, the superheater, economizer and air preheater, and then through the dust removal device, wherein the fly ash is removed, and finally sent to the chimney by the induced draft fan to the atmosphere.

What are the precautions in the loading and installation of gas-fired steam 10 steam tons of boiler prices?

Gas-fired steam boilers are a very wide range of special equipments, widely used in food, chemical, paper, textile, construction and other industries. In the process of loading and installing a gas steam boiler, some problems must be paid attention, otherwise it may cause a certain degree of economic loss.

1. Pay attention to the following matters during the loading and unloading and handling of gas-fired boilers: the lifting capacity of the lifting equipment should match the weight of the lifting boiler. The lifting lug on the boiler with the lifting lugs that cannot be used for lifting can not be used for lifting. The length of the steel cord should be reasonably selected to avoid the scratching of the furnace due to the improper length of the steel cord. The boiler must be protected from any damage during handling and handling.

2. Reserves for maintenance space When installing boilers, ensure that there is sufficient maintenance space around the boiler.

3. Setting and precautions for the base and base of the gas steam boiler The boiler body must be installed on the basis of 100-150mm above the floor of the boiler room. It must be confirmed with the technical personnel of the boiler manufacturing company in advance and constructed according to the basic drawings. The anchor bolts must be reserved on the foundation. The foundation shall be capable of withstanding the maximum weight of the boiler and the amount of water it holds. When installing the base, you must first position it. After positioning, adjust to the same length of the two diagonals of the base, and then tighten all the fixing bolts. The installation of the base is carried out with reference to the reference line.

4, general precautions Be careful not to tilt and impact the boiler and accessories too much. No combustibles can be placed around the boiler. Do not use oil and water to smother the boiler. The boiler should normally be installed in a separate boiler room. The new gas-fired boiler room should not be connected to the house. The boiler room shall not be connected to Class A, Class B and Category C fire hazard rooms using flammable liquids. If connected to other production plants, the application firewall is separated.

5. The fire resistance grade and fire protection requirements of the boiler house building shall comply with the requirements of the Code for Fire Protection of Building Design and the Code for Fire Protection Design of High-rise Civil Buildings. The ground of the gas steam boiler room should be flat, non-flammable, no water accumulation, and the foundation load should meet the requirements. The power supply voltage of the gas steam boiler room should be stable to avoid causing the electrical components to burn out. If the voltage is unstable, it is recommended to install a voltage regulator. Ventilation equipment should be installed in the boiler room, and the boiler should be kept at room temperature below 50 °.

Gas 10 steam tons of boiler price heat loss through the combustion of fuel gas boiler, will release some heat, which will supply part of the user, some will be recycled and part is inadvertently wasted. So these are wasted heat lost through the ways in which it (1) heat losses:? Flue gas exhaust gas boiler part of the heat into the atmosphere, causing the boiler heat losses, it is each boiler term heat loss Dazhong biggest one. The main factors influencing the heat loss is higher exhaust gas temperature and the amount of smoke exhaust gas temperature, the greater the amount of smoke, the greater the heat loss. Low exhaust gas temperature depends mainly on the number and operating conditions of the heating surface; the amount depends on how much leakage exhaust case and the furnace excess air, flue. (2) heat loss incomplete combustion gas: a part of the unburned combustible gas is discharged with the flue gas to heat loss caused by heat in the flue gas. The main factors affecting the incomplete combustion gas heat loss is the excess air and furnace structure. Excess air coefficient is too small, uneven air is mixed with fuel, easy to generate carbon monoxide and other combustible gases; excess air coefficient is too large, the furnace temperature is lowered, the combustible gas is not easy ignition and combustion. Furnace volume is too small, combustible gases in the furnace too late to enter the combustion flue gases caused by incomplete combustion heat loss. (3) heat loss: the furnace heat loss, frameworks, pipes, door opening caused by heat dissipation to the surroundings. Size depends on the heat loss factors of the size of the surface area of ​​the furnace gas steam boiler, heat insulating properties and thickness, the outside air temperature and the flow velocity. Electric heating reactor common external damage: an electrically heated reactor despite external corrosion has a high etching resistance against acid and alkali resistance, but our electrical heating by the heating apparatus is a kettle layer and an outer tire iron constituted. Such a medium is iron acids and bases are not corrosion-resistant. If we would have the production process if the reactor cover or screwed pipe joints without seal failure or leak acid tire iron reactor apparatus for electrically heating the outer corrosion. Corrosion support member 2. The reactor was heated electrically heated reactor during installation, support or other support member may be mounted directly on the floor, due to the long manufacturing operations on the floor may be deposited with corrosive media, so that for support our reactor electrically heated apparatus corrosion, resulting in the supporting force of each of the support produces a change resulting in a change in stress in the damage produced during heating layer. 3. The electrically heated reactor stress spout in the electrically heated reactor, when the steel of the pipe and the pipe joint, since the thermal deformation and the reaction was heated electrically heated autoclave vessel or duct stressed cold might damage the pipe.

Other Products